The construction of water infrastructure projects across Western Australia has been a core capability since 1976. It is this experience that clients including the Water Corporation call upon to deliver successful project outcomes. We take pride in knowing that our involvement in water infrastructure projects contributes to the improvement of communities and their environment.

Key Services

  • Water pumping stations
  • Borefield pumps and controls
  • Sewerage pumping stations
  • Vacuum sewer pumping stations
  • Water and wastewater treatment plants
  • Pond construction
  • Concrete structures
  • Mechanical and electrical fit out and commissioning
  • Building and associated civil elements
  • Realignment and service diversions

Water Infrastructure projects

View our recent project reports by clicking on the images below.

Shorehaven Wastewater Pumping Station and Pressure Main

Peet Limited commissioned the construction of a new wastewater pumping station and selected DM Civil to construct the works.

2108 a Shorehaven

Austin Cove WWPS

Austin Cove is a residential estate on the western side of the Forrest Highway in South Yunderup.

Austin Cove WWPS

Canning Vale Pumping Station

DM Civil were able to deliver a complex infrastructure project in an existing residential setting, with minimal impact to the surrounding homeowners and community.

Canning Vale Pump Station

Narngulu Wastewater Treatment Plant

As Geraldton continues to expand, a new wastewater treatment plant (WWTP) was needed to take pressure off the town's existing infrastructure.

Project link Narngulu Wastewater

Walkaway Pump Station

The Walkaway Water Supply Pumping Station is an important part of the Geraldton Water Supply Scheme.

Project link Walkaway Pump Station

Jurien Bay Wastewater Treatment Plant

Due to the rapid population growth in the Jurien Bay area DM Civil was engaged to double the capacity of the existing Wastewater Treatment Plant (WWTP) by constructing a new primary pond, secondary pond and subsequent infiltration ponds.

2082 Jurien Bay project header image

Arthur Creek Dam, Kununurra

Outlet Works based at Arthur Creek Dam, which at the time, was one of the largest private irrigation schemes in the state.

2071 a Arthur Creek WEB

Pingelly WWTP Upgrade

We were awarded the Pingelly WWTP Upgrade Project by Water Corporation. The works comprise the construction, testing and commissioning complete with all ancillary works.

2085 a Pingelly

Arthur Creek Dam Crest Upgrade

DM Civil worked closely with the client and the consulting engineer, GHD Pty Ltd, to provide a constructible solution to rebuilding and relining the existing dam wall.

2115 a Arthur Creek

Client references for Water Infrastructure projects

I am writing to thank you and the DM Civil team for the great work you have done on both ponds at the Kwinana Water Recycling Plant. This was a job that involved some detailed organisation and setting out, coordination with the lining contractor and with the Water Corporation operations so that we could guarantee continuity of supply.

Your components were always completed on time, to the budgeted costs and with no significant adverse safety issues. The attention paid to the detail, timely response to issues and help and cooperation in problem solving was paramount to ensuring the job was delivered in the shortest possible time frame.

Bob Wark - Technical Director Dams
GHD Pty Ltd

Careful planning and strong client - contractor communication has resulted in the efficient delivery of 980m of new rail formation and supporting access road and drainage infrastructure. The team conducted themselves with professionalism on site and a strong safety focus with no major incidents or injuries during to course of the works.

The ability of the team to provide value adding, engineering solutions to overcome unforeseen problems, namely, unsuitable sub grade material, ongoing wet weather and site drainage problems is testament to the wide range of skills contained within the DM Civil Team. DM Civil displayed a mature approach to dealing with contractual issues, with the delivery of best for project outcomes evident throughout the entire construction period.

Brendan Lane - Construction Manager, Specialised Track Services
QR National Network

The team demonstrated excellent planning and organisation resulting in smooth execution of the project.

The team has also shown its eagerness to resolve challenges on site through good communication with the Water Corporation and therefore building a strong positive working relationship on site.

Issues during the construction of the road were easily resolved by DM Civil design proposals which overcame unforeseen problems such as dealing with the rocky areas and drainage alignment issues which showed their experience and skills.

DM Civil also displayed a mature approach in dealing with contractual issues throughout the entire construction period.

Michael Mulrennan - Superintendent, Project Director
Water Corporation

From the beginning it was a pleasure to work with DM Civil staff, and I was impressed by how yourselves and staff from the Water Corporation worked together cooperatively to get the job done effectively and safely.

All issues that arose were dealt with promptly and fairly by both parties, and this helped to successfully deliver the project in a timely manner.

DM Civil should be proud of the important part they played in securing Dwellingup's long-term water needs.

Chris Higgs - Superintendent
Water Corporation