The locality of Lakelands in the northern area of City of Mandurah is one of many residential growth centres. With this growth comes the need for services, including potable water supply for new housing and to maintain mains pressure for…
Water Corporation introduced a potable water pipe replacement scheme under ‘Pipes for Perth’, which has been gradually restoring the existing century old pipe network throughout the Perth metropolitan area.
Construction of the pipeline across the Canning River presented challenges in preservation of bed and banks areas, with all foot traffic carried by a temporary bridge and for construction equipment to approach from both sides.
This project involved the installation of 2.2km of new DN600 MSCL pipeline to replace the existing aged 610CI water main on Canning Highway between Sewell Street and Hammad Street in East Fremantle as it has been identified, through camera survey,…
Water Corporation identified that the available water pressure in the pipe network was no longer adequate to supply the rapidly expanding town of Byford and surrounds. To meet this growing demand, a design was implemented to upgrade the area to…
Project Summary Location Southampton WA Â Capability Trenchless Technology Client Water Corporation Status Completed Start February 2015 End November 2015 Download Project Report PDF, SIZE Project Overview As a part of the scheme, a link main between Millstream Dam and…
Project Summary Location Three Springs, Mingenew and Morowa WA  Capability Mining Infrastructure Water Infrastructure & Pipelines Client Karara Mining Ltd. Status Completed Start July 2010 End December 2011 Download Project Report PDF, SIZE Project Overview The Karara mine is…
Project Summary Location Mingenew WA  Capability Mining Infrastructure Water Infrastructure & Pipelines Client Karara Mining Ltd. Status Completed Start January 2011 End October 2011 Download Project Report PDF, SIZE Project Overview The borefield is located west of the Yandanooka…
Project Summary Location Karratha, Roebourne  Capability Mining Infrastructure Water Infrastructure & Pipelines Client Lend Lease Status Completed Start October 2012 End December 2013 Download Project Report PDF, SIZE Project Overview We were engaged by Abigroup to complete these works…
Project Summary Location Broomehill Village WA Capability Water Infrastructure Client Water Corporation Status Completed Start April 2023 End May 2023 Download Project Report.. PDF, SIZE Project Overview Broomehill and Tambellup are supplied with potable drinking water through a reticulated pipeline…
Project Summary Location Perth, WA  Capability Trenchless Technology Client Water Corporation Status Completed Start July 2015 End November 2015 Download Project Report PDF, SIZE 0.4MB Project Overview This project required the relining and modification of the main reservoir outlet…
Project Summary Location Katanning, WA  Capability Water Infrastructure & Pipelines Client Water Corporation Status Completed Start November 2015 End January 2016 Download Project Report PDF, SIZE 0.3MB Project Overview The project involved the installation of 560 metres of DN150…