Alcoa operates three refinery facilities in WA, including Kwinana Beach. The Kwinana facility sends material to the residue storage area (RSA) on Abercrombie Road, east of the refinery.
A function of the RSA includes the operation of a cooling pond, essential to the refinery process. The RSA undergoes growth from a continuously expanding volume of residue sand which changes levels and the general configuration of the area. As a part of the long term strategy of the RSA, the cooling pond required the addition of an emergency overflow facility to accommodate runoff from a probable maximum flood event.
The project included the construction of an RC culvert and spillway structure that discharged into a drainage channel and into a low point to the southeast of the site. The outfall from the spillway structure and a tight bend in the channel required mortared rock pitched scour protection and the banks of the channel were lined with cleared vegetation material.
DM Civil was awarded the contract for the full scope of works including earthworks, concrete construction, roadworks and cutting into the existing HDPE pond liner.
DM Civil delivered a diverse scope of works with in-house capabilities ahead of time to meet a tight programme.