The Canning Dam water mains are an element of the integrated water supply scheme (IWSS). The back feed main is a DN760 ‘locking bar’ pipe.
The 100 year old pipe has reached its service life and is in the process of gradual replacement with the priority of work being critical supply destinations and the number of failures over time. In 2017, a 150m section on the western slope of Butcher Road in Roleystone was identified as a critical section requiring immediate replacement and this was carried out by DM Civil under a design and construct contract.
The stage 2 eastern slope was the next most critical section of the pipeline, and subject to the same working slopes as well as a river crossing. The contract to replace this was awarded to DM Civil in 2021. The main difference between the two sections was that the western section was completely buried and the eastern section was to remain above ground on the slope down to the Canning River, with a further 530m across the comparatively flat farmland, to be buried.
Construction of the pipeline across the Canning River presented challenges in preservation of bed and banks areas, with all foot traffic carried by a temporary bridge and for construction equipment to approach from both sides.