DM Civil was engaged by Qetra to deliver a turnkey gas pipeline including civils and supporting works for a metering station, on behalf of APA Group in Kalgoorlie West.
The 1.5 kilometre DN150 API 5L PSL2 X52 Binduli Gas Pipeline was delivered in full by DM Civil, including all project management, construction and pre-commissioning prior to handover to APA Group. The fully welded steel pipeline was delivered without a single weld requiring repair, indicative of the quality of the welding crew.
The Karrawang Metering Station required an abundance of civil works to enable construction of the station for our client, Qetra. This included a deep excavation to remove and replace unsuitable in-situ soils to support the station, building of hardstands and roads, drainage and other enabling works.
Our scope expanded to assist our client in numerous areas, including construction of concrete supports, critical lifting, asphalting and rock protection, fencing and more.
The capability and capacity of the DM Civil Oil, Gas and Energy Division was recognised by the head contractor as well as the end user in APA Group.