Skip to main content

DMCivil

Vittoria Road Glen Iris – HP 050 Realignment

Project Summary

Location

Bunbury, WA

Capability

Client

ATCO Gas

Status

Completed

Start

August 2021

End

October 2021

Download Project Report

Project Overview

DM Civil was requested by ATCO Gas to carry out the construction of a DN150 high pressure steel gas pipeline in rural Western-Australia. The purpose being to realign the pipeline away from a major road upgrade project, which would otherwise be detrimental to the existing pipeline’s integrity.

The pipeline was to be installed to AS2885 standards, and with two distinct methodologies being horizontal directional drilling (HDD) and open excavation. The working area was very restricted and required a number of critical controls to ensure no adverse effects on the environment or to existing services.

The project was on a tight schedule, with the client requiring a quick execution in order to not delay the major road upgrade. DM Civil was entrusted with the job and completed it without complaint or delay. 

DM Civil’s recent experience constructing steel gas pipelines for ATCO Gas gave our client the confidence that we could deliver the project on time.

Significant achievements and benefits

  • Horizontal directional drilling (HDD) was used for installation of pipe under South Western Hwy. Rocky ground conditions were a possibility. DM Civil applied a specialised UV-cured fibreglass abrasion-resistant-overwrap (ARO) to the pipe to be installed by HDD.
  • Significant dewatering was required at sections on the pipeline, due to the high-water table and recent winter rains. Groundwater collected could not be discharged to the environment due to the nearby Preston River, prompting a different solution. Instead, DM Civil carried out a ground investigation to find a suitable re-injection site. Once found, a discharge line, sump and injection system were built to reinject the groundwater.
  • The groundwater present on site was not the only challenging ground condition encountered. A number of old tree stumps were present along the alignment, with thick roots entangling below-ground services that could not be easily removed. Stump grinding and careful digging was carried out by the DM Civil team to safely remove the roots without damaging the services, allowing the excavation to continue. Careful pipelaying beneath the services was also required, but was no issue for the DM Civil team.
  • DM Civil was requested to assist ATCO Gas in the hot tap connection process, providing lifting, live-welding and field-joint coating support to enable the connection.

Despite the tight schedule and ground conditions encountered, DM Civil’s team accomplished the project with ease and on time. The continuing relationship with our client ATCO Gas has led to DM Civil completing many more gas pipeline projects to a high standard.

Your Trusted Civil Engineering Partner

Our team is eager to chat about your needs and craft tailored solutions for your success.