DM Civil was introduced to a new developer through a trusted consulting engineering firm to form a team which was to deliver a high standard compact lot design subdivision.
The first stage of work required the task of working alongside a subcontractor engaged to produce very detailed high quality frontage walls with stair, gate and fence designs that challenged the traditional order of construction. This process tested the planning and logistics skills of the project management team and was to set the procedure for the subsequent stages.
The entire development was also dependent on a sewer link downstream of the development several streets away. A duplication of an existing portion of sewer was required to service the increased capacity required for the development. This was constructed by a separate crew in parallel with the Stage 3 lot production.
The modern and affordable lots produced, provide easy access to the Kwinana Freeway, the rail network and the Gateway Shopping Centre.
The Mojo Urban Living project resulted in the formation of a new client relationship that has proven to be a successful partnership in challenging times.