Land Development

DM Civil, as primary contractor, partners with Western Australia’s most high profile consulting engineers and land development companies to achieve their vision of sustainable communities. We provide all civil works for residential and industrial projects.

Key Services

Land Development projects

View our recent project reports by clicking on the images below.

CCGS Site Remediation

DM Civil undertook soil remediation works at Lot 816 of Swan Location 10780 on Stephenson Avenue, Mount Claremont in Western Australia, owned by the Christ Church Grammar School (CCGS). The site has been redeveloped as playing fields and sports pitches for CCGS.

CroppedImage1200400 2103 Claremont Christchurch Grammar 0012

Lot 200 Ocean Reef Road

Through our considerable experience in land development, remediation skills and working within the community, DM Civil were engaged to complete this important development for LandCorp.

2067 a Ocean Reef

Carine Rise Civil Works

This 7.93ha site was redeveloped by Cedar Woods together with their project partners, Landcorp and the St Ives Group. The redevelopment incorporates residential lots, townhouses, apartments, residential aged care, a retirement village and mixed use development.

Project link Carine Rise V2

Clarkson District Centre

On the discovery of extensive uncontrolled fill across the site, additional scope of works was necessary to screen and dispose of this material. However, DM Civil were able to deliver this project within the allocated timeframe, minimising costs and environmental impact for the client.

Land development subdivision in Clarkson

Lake Coogee Stage 3

The development was previously used as a market garden, however with the use of deep penetration compaction techniques, the existing ground could be utilised to meet a Class A site. This was a great benefit to the client.

Project link Lake Coogee Stage 3

WAPS Carpark Midland Redevelopment

The Midland Railway workshops were originally constructed in 1904 and were an integral part of the Midland community, providing work for many local citizens.

Project header WAPS Carpark

Lapsley Road, Claremont

The Claremont Police and Community Youth Centre (PCYC) had relocated to improved facilities in Subiaco. For this project the existing structure and the adjacent air rifle range shed was redeveloped into a small boutique land development made up of 29 cottage lots.

2070 a Lapsley Road

Champion Lakes Stage 6

This is the penultimate stage of Landcorp’s Champion Lakes Estate, located between Lake Road and Champion Lake. The project ran over 24 weeks producing a high class finish to the satisfaction of the consultant and the client.

2074 a Champion Lakes 6

Tuckey Cove Stage 3

This is the third stage of the proposed nine stage Tuckey Cove development in the fast developing Dudley Park area in Mandurah. Due to a spike in sales the client wanted this stage to be ready and available for sale as soon as possible.

2079 a Tuckey Cove 3

Madora Bay East Stage 2B

This Stage 2B of the multi-stage Madora Bay land development project by NG Perry Testamentary Trust provides 34 beachside lifestyle residential lots and abuts the popular pristine Madora Bay.

2080 a Madora Bay web

The Crest Mosman Park

The Crest development is a short walk from the Swan River waterfront and is considered highly sought after. LandCorp placed great emphasis on maintaining local flora in and around the project site, particularly the retention and preservation of the local trees.

2081 a The Crest

Trinity Stage 30 Civil Works and Stage 31 Earthworks

Engaged on the Trinity Development for LWP after a successful tender bid with consultant GHD. The contract was for the construction of ongoing subdivisional stages over a twelve month period.

2095 a Trinity

Emerald Park Stage 6

DM Civil completed a 129 lot subdivision 5 weeks ahead of schedule while maintaining a high standard of construction.

2098 a Emerald Park

2110 Trinity Stage 31 Civil Works

Trinity Estate development: Trinity Stage 31 Civil Works subdivision project

2110 a Trinity Stage 31

Client references for Land Development projects

Having DM Civil on a project is always a pleasure as we know the project will be undertaken in a professional manner and completed to a high standard which Pritchard Francis prides itself on.

DM staff are always available, ready to help and nothing is a problem. We not only rely on DM Civil for development construction but also early project help when developments are in their infancy stage, when we require information on costs and methods of construction. When asked for this information, not only is it forthcoming but from DM Civil it is also accurate.

Philip Patterson
Project Director, Civil Pritchard Francis

Not only was the contract completed ahead of program, but the quality of construction was a true testament of the skill, application and attendance of all personnel through the complete duration of the project. This was reflected in the final presentation and the minimal items identified at the Practical Completion inspection.

Furthermore, where contract variations were identified with the extension of the scope of works, all variation costs were always fair and reasonable.

Barry Smith
Director, TABEC PTY LTD

The works were carried out in accordance with programme, budget and specification. We are very pleased with the performance of DM Civil and would highly recommend the company to others as a result.

The management team are extremely professional, organised and easy to deal with.

Ken Haustead
Senior Development Manager, Cedar Woods

The work was performed with a high level of commitment, care and attention to detail which not only impressed LandCorp and other members of the project team, but also gained a lot of respect and appreciation from the Shire of Dandaragan and the local community.

LandCorp appreciated the excellent work done by DM Civil which has significantly contributed to the success of this project.

Margriet Van Tuyll
Project Manager, LandCorp