 HP048 Gas Pipeline Protection

HP048 Gas Pipeline Protection

DM Civil was requested by ATCO Gas to carry out protective wrapping and slabbing on a high-pressure steel gas pipeline in rural Western Australia. The existing pipeline was located in an area about to be affected by major highway construction…
 HP048 Gas Pipeline Protection

HP048 Gas Pipeline Protection

DM Civil was requested by ATCO Gas to carry out protective wrapping and slabbing on a high-pressure steel gas pipeline in rural Western Australia. The existing pipeline was located in an area about to be affected by major highway construction…
 Vittoria Road Glen Iris – HP 050 Realignment

Vittoria Road Glen Iris – HP 050 Realignment

DM Civil was requested by ATCO Gas to carry out the construction of a DN150 high pressure steel gas pipeline in rural Western-Australia. The purpose being to realign the pipeline away from a major road upgrade project, which would otherwise…
 Welshpool Station HP Gas Pipeline Relocation

Welshpool Station HP Gas Pipeline Relocation

The Welshpool Station HP Gas Pipeline Relocation project for ATCO Gas required the construction of a section of DN150 carbon steel high pressure gas pipeline to AS2885 standards. The purpose of the project was to realign the pipeline in order…
 East Perth Power Station (EPPS) Pipeline

East Perth Power Station (EPPS) Pipeline

Project Summary Location East Perth WA   Capability Water Infrastructure & Pipelines Client ATCO Gas Australia Status Completed Start May 2022 End May 2023 Download Project Report PDF, SIZE Project Overview The Pressure Reduction Station located on the East Perth…