DM Civil’s depth of experience in gas pipeline construction in difficult areas was sought by ATCO Gas to deliver this difficult project. Despite the difficulties faced, and increased scope of works, DM Civil delivered on program.
DM Civil was requested by ATCO Gas to carry out protective wrapping and slabbing on a high-pressure steel gas pipeline in rural Western Australia. The existing pipeline was located in an area about to be affected by major highway construction…
DM Civil was requested by ATCO Gas to carry out the construction of a DN150 high pressure steel gas pipeline in rural Western-Australia.
The Denny Avenue, Kelmscott, and North Lake Road, Cockburn projects for ATCO Gas required the construction of two separate DN300 and DN150 carbon steel high pressure gas pipeline to AS2885 standards.
The Denny Avenue, Kelmscott, and North Lake Road, Cockburn projects for ATCO Gas required the construction of two separate DN300 and DN150 carbon steel high pressure gas pipeline to AS2885 standards.
DM Civil was requested by ATCO Gas to carry out protective wrapping and slabbing on a high-pressure steel gas pipeline in rural Western Australia. The existing pipeline was located in an area about to be affected by major highway construction…
DM Civil was requested by ATCO Gas to carry out the construction of a DN150 high pressure steel gas pipeline in rural Western-Australia. The purpose being to realign the pipeline away from a major road upgrade project, which would otherwise…
DM Civil was engaged by Qetra to deliver a turnkey gas pipeline including civils and supporting works for a metering station, on behalf of APA Group in Kalgoorlie West.
The Welshpool Station HP Gas Pipeline Relocation project for ATCO Gas required the construction of a section of DN150 carbon steel high pressure gas pipeline to AS2885 standards. The purpose of the project was to realign the pipeline in order…
Project Summary Location East Perth WA  Capability Water Infrastructure & Pipelines Client ATCO Gas Australia Status Completed Start May 2022 End May 2023 Download Project Report PDF, SIZE Project Overview The Pressure Reduction Station located on the East Perth…