DMCivil

 Bullsbrook Wastewater Diversion to Ellenbrook

Bullsbrook Wastewater Diversion to Ellenbrook

With significant population growth in the Bullsbrook area, the wastewater treatment facility at Bullsbrook is to be decommissioned, with flows diverted to Ellenbrook. DM Civil was engaged to carry out these works which include: Upgrade of the existing Bullsbrook North…
 Warradale Terrace and Rogers Way Pressure Mains

Warradale Terrace and Rogers Way Pressure Mains

Construction of Warradale Terrace and Rogers Way Pressure Mains. Due to continued growth in the Northern Perth corridor, the Warradale Terrace Wastewater Pumping Station was reaching its ultimate capacity.  Water Corporation engaged DM Civil to construct upgrade works to the…
 Yanchep Pressure Main, Main Sewer & Collector Sewer

Yanchep Pressure Main, Main Sewer & Collector Sewer

Project Summary Location Yanchep, WA   Capability Trenchless Technology Client Water Corporation Status Completed Start November 2013 End December 2014 Download Project Report PDF, SIZE Project Overview This project involved the construction of a pressure main, main sewer and collector…
 Lot 500/501 Hay Street Sewer Extension

Lot 500/501 Hay Street Sewer Extension

Project Summary Location Subiaco WA   Capability Trenchless Technology Client Dradgin Property Status Completed Start January 2015 End June 2015 Download Project Report PDF, SIZE Project Overview DM Civil was tasked with the construction of the sewer for the new…
 Karara Water Operations

Karara Water Operations

Project Summary Location Three Springs, Mingenew and Morowa WA   Capability Mining Infrastructure Water Infrastructure & Pipelines Client Karara Mining Ltd. Status Completed Start July 2010 End December 2011 Download Project Report PDF, SIZE Project Overview The Karara mine is…
 East Perth Power Station (EPPS) Pipeline

East Perth Power Station (EPPS) Pipeline

Project Summary Location East Perth WA   Capability Water Infrastructure & Pipelines Client ATCO Gas Australia Status Completed Start May 2022 End May 2023 Download Project Report PDF, SIZE Project Overview The Pressure Reduction Station located on the East Perth…
 Roe Hwy Sewer Main Relocation

Roe Hwy Sewer Main Relocation

Project Summary Location Welshpool, WA   Capability Trenchless Technology Client Gateway WA Water Corporation Status Completed Start November 2015 End January 2016 Download Project Report PDF, SIZE 0.4MB Project Overview As a part of the Perth Airport and Freight Link…
 Mt Eliza Reservoir

Mt Eliza Reservoir

Project Summary Location Perth, WA   Capability Trenchless Technology Client Water Corporation Status Completed Start July 2015 End November 2015 Download Project Report PDF, SIZE 0.4MB Project Overview This project required the relining and modification of the main reservoir outlet…
 2102 Monash to Eaton River Crossing

2102 Monash to Eaton River Crossing

Project Summary Location Bunbury, WA Capability Trenchless Technology Client Water Corporation Status Completed Start July 2015 End August 2015 Download Project Report PDF, SIZE 0.7MB Project Overview This 310 metre crossing of DN450 PE pipe is one of many large…
 Lake Coogee Estate Stages 1 & 2 Sewer Microtunneling

Lake Coogee Estate Stages 1 & 2 Sewer Microtunneling

Project Summary Location Munster, WA   Capability Trenchless Technology Client Citibond Status Completed Start July 2008 End April 2009 Download Project Report PDF, SIZE 1.0MB Project Overview This contract involved the construction of 1,701m of DN150 and DN225 PVC gravity…