With significant population growth in the Bullsbrook area, the wastewater treatment facility at Bullsbrook is to be decommissioned, with flows diverted to Ellenbrook. DM Civil was engaged to carry out these works which include: Upgrade of the existing Bullsbrook North…
Construction of Warradale Terrace and Rogers Way Pressure Mains. Due to continued growth in the Northern Perth corridor, the Warradale Terrace Wastewater Pumping Station was reaching its ultimate capacity. Â Water Corporation engaged DM Civil to construct upgrade works to the…
Project Summary Location Yanchep, WA  Capability Trenchless Technology Client Water Corporation Status Completed Start November 2013 End December 2014 Download Project Report PDF, SIZE Project Overview This project involved the construction of a pressure main, main sewer and collector…
Project Summary Location Bunbury WA  Capability Trenchless Technology Client Water Corporation Status Completed Start April 2015 End September 2015 Download Project Report PDF | 0.3 MB Project Overview With auger boring, slurry microtunnelling and guided pilot boring methodologies being…
Project Summary Location Southampton WA Â Capability Trenchless Technology Client Water Corporation Status Completed Start February 2015 End November 2015 Download Project Report PDF, SIZE Project Overview As a part of the scheme, a link main between Millstream Dam and…
Project Summary Location Subiaco WA Â Capability Trenchless Technology Client Dradgin Property Status Completed Start January 2015 End June 2015 Download Project Report PDF, SIZE Project Overview DM Civil was tasked with the construction of the sewer for the new…
Project Summary Location Three Springs, Mingenew and Morowa WA  Capability Mining Infrastructure Water Infrastructure & Pipelines Client Karara Mining Ltd. Status Completed Start July 2010 End December 2011 Download Project Report PDF, SIZE Project Overview The Karara mine is…
Project Summary Location East Perth WA  Capability Water Infrastructure & Pipelines Client ATCO Gas Australia Status Completed Start May 2022 End May 2023 Download Project Report PDF, SIZE Project Overview The Pressure Reduction Station located on the East Perth…
Project Summary Location Welshpool, WA  Capability Trenchless Technology Client Gateway WA Water Corporation Status Completed Start November 2015 End January 2016 Download Project Report PDF, SIZE 0.4MB Project Overview As a part of the Perth Airport and Freight Link…
Project Summary Location Perth, WA  Capability Trenchless Technology Client Water Corporation Status Completed Start July 2015 End November 2015 Download Project Report PDF, SIZE 0.4MB Project Overview This project required the relining and modification of the main reservoir outlet…
Project Summary Location Bunbury, WA Capability Trenchless Technology Client Water Corporation Status Completed Start July 2015 End August 2015 Download Project Report PDF, SIZE 0.7MB Project Overview This 310 metre crossing of DN450 PE pipe is one of many large…
Project Summary Location Munster, WA  Capability Trenchless Technology Client Citibond Status Completed Start July 2008 End April 2009 Download Project Report PDF, SIZE 1.0MB Project Overview This contract involved the construction of 1,701m of DN150 and DN225 PVC gravity…