The Denny Avenue, Kelmscott, and North Lake Road, Cockburn projects for ATCO Gas required the construction of two separate DN300 and DN150 carbon steel high pressure gas pipeline to AS2885 standards. The purpose of the projects was to realign the…
DM Civil was requested by ATCO Gas to carry out protective wrapping and slabbing on a high-pressure steel gas pipeline in rural Western Australia. The existing pipeline was located in an area about to be affected by major highway construction…
This project involved the installation of 2.2km of new DN600 MSCL pipeline to replace the existing aged 610CI water main on Canning Highway between Sewell Street and Hammad Street in East Fremantle as it has been identified, through camera survey,…
With significant population growth in the Bullsbrook area, the wastewater treatment facility at Bullsbrook is to be decommissioned, with flows diverted to Ellenbrook. DM Civil was engaged to carry out these works which include: Upgrade of the existing Bullsbrook North…
DM Civil was introduced to a new developer through a trusted consulting engineering firm to form a team which was to deliver a high standard compact lot design subdivision. The first stage of work required the task of working alongside…
Construction of Warradale Terrace and Rogers Way Pressure Mains. Due to continued growth in the Northern Perth corridor, the Warradale Terrace Wastewater Pumping Station was reaching its ultimate capacity. Â Water Corporation engaged DM Civil to construct upgrade works to the…
Christ Church Grammar School identified some years ago, the future need for an increased number of sports fields and facilities to sustain the continual growth in pupil numbers. They purchased a parcel of land, formerly a part of the Brockway…
Water Corporation identified that the available water pressure in the pipe network was no longer adequate to supply the rapidly expanding town of Byford and surrounds. To meet this growing demand, a design was implemented to upgrade the area to…
Project Summary Location Yanchep, WA  Capability Trenchless Technology Client Water Corporation Status Completed Start November 2013 End December 2014 Download Project Report PDF, SIZE Project Overview This project involved the construction of a pressure main, main sewer and collector…
Project Summary Location Bunbury WA  Capability Trenchless Technology Client Water Corporation Status Completed Start April 2015 End September 2015 Download Project Report PDF | 0.3 MB Project Overview With auger boring, slurry microtunnelling and guided pilot boring methodologies being…
Project Summary Location Southampton WA Â Capability Trenchless Technology Client Water Corporation Status Completed Start February 2015 End November 2015 Download Project Report PDF, SIZE Project Overview As a part of the scheme, a link main between Millstream Dam and…
Project Summary Location Subiaco WA Â Capability Trenchless Technology Client Dradgin Property Status Completed Start January 2015 End June 2015 Download Project Report PDF, SIZE Project Overview DM Civil was tasked with the construction of the sewer for the new…